Lots of activity, but everyone seemed to miss the mark.
Stucco painting guys painted the elevated area outside the screen enclosure, but (initially) forgot about the steps inside the enclosure (they came back way later in the day and finished that up.
Tiles guys were supposed to just replace 4 waterline tiles that the paver guys messed up, but instead they kept trying to "solve the whole puzzle" of what the paver guys would need instead of just doing what they were supposed to. After working with them via Google Translate for 90 minutes, their boss called and got them on track, however, for whatever reason, they put in black grout instead of blue. Later in the day, I scraped out the black before it set so that they could come back and put the blue in.... They never came back.
Eric showed up and went to work on painting his last tweak to the spa and chipped away a little more on the left side. Outside of some slight coloration mis-matches, he did a good job overall.
No pavers guys. Ugh.
Everything inside the cage is supposed to be completed BEFORE Monday. It is now the end of the day Friday. We need to have the water back up to the right level after draining it for the waterline tile repair. They are planning on cleaning everything inside and out of the cage (it is a MESS everywhere due to all of the grinding and cutting of things, mainly pavers. The screen is just coated with stuff that doesn't just wash off, so it will be interesting if the last remaining things aren't done before Monday.
Tuesday is the first day of paver sealing too.