Getting the crane ready to operate Monday morning when you arrive at the bottom cab, crane already set up, riggers out, (blocked duties). Ballast on. Turn on master switch, turn key, wait on self check clicks, start up, build up air pressure, switch on pto, switch over to top cab, click ignition back one click, engine will stop. Start and stop engine from top cab now.
Air pressure has to remain for this system to operate. So if it doesn’t work at the top the air pressure is one thing to check
(Job specific at the time) Location of 12 monthly insurance and tackle 6 monthly inspection sheets, daily crane check sheets and crane manual location.