-We are assessing most everything in the helm and back area.
Areas of assessment that needs to address:
-Helm radios and location
-Replacing scuppers and lines
-canopy rail guards and scuba dive bench locations and what kind
-Toggle gauge replacement with new rocker switch panel (new panel came in)
-Replacement of all old analog gauges to digital
Ultimate goal is to have a low profile helm area for the vertically challenged and for the captain to sit occasionally and still see. We want to have a nice area in the open area in the back to sit and set up our dive tanks and store tanks and spear guns and pole spears.
Subscribe to watch our family adventures.
KZitem: www.conefamilyadventures.com
Store: www.treasureworldcenter.com or www.jessieswoodworking.com
Негізгі бет 2023 The Cone Family - 1990 Grady White 25' Sailfish Boat Project (Part 3)
Пікірлер: 4