#MRYCG
In this episode I take you through the steps I took to improve the pull out section of the layout. It began life with just two tracks but soon was changed to four tracks so I could run trains continually without having to stop one for another to cross the bridge, this was a major job a good while ago. Since then I have never been happy with it being a pull out section and wanted to fix it in place on hinges. I went about designing the hinges and 3D printing them to my own specifications. The track was re-laid not only over the bridge but in the wardrobe section as well to improve running.
This is part one of the build as I soon realised that it does not look finished so I intend extending the bridge with an embankment either side, this will be part two in the future.
Негізгі бет #51 A Bridge Too Far Part 1
Пікірлер: 13