Residents in a small village of New Haw came out to watch the abnormal load (electricity transformer).
The load began its journey from Luton on the Saturday (20 July) travelling via the M1 before joining the M25 at Junction 19. It travelled along the M25 before coming off at junction 11 and travelling through Ottershaw and Sheerwater before eventually coming to a stop in New Haw, Surrey.
Негізгі бет A 70 metre, 140 Tonne Abnormal load making its way into New Haw, Surrey
Пікірлер: 140