New truck beds comes in parts to WIN Industri in Gällivare. WIN weld them together, mount rubber plates and some wear plates. Then GE Maskintjänst drive them out to Bolidens open pit mine, Aitik. The truck bed are around 55 metric tons heavy, 8 meter wide and 14 meter long. They close down the road and move the truck bed on a heavy trailer from WIN to Aitik, around 20 km.
- Күн бұрын
A truck bed on the way from WIN Industri to Aitik
- Рет қаралды 1,025
Пікірлер