The Gujarat Metro Rail Corporation Limited was established in February 2010 and the 40.03 km (24.87 mi) long Phase-1 of the project was approved in October 2013 with two corridors, North-South and East-West. The construction started on 14 March 2015. A 6.5-km section of East-West corridor was inaugurated on 4 March 2019 and was opened to the public on 6 March 2019. The rest of the Phase-1 was inaugurated on 30 September 2022 and opened to public on 2 and 6 October 2022.
In January 2021, the construction of the 28.26 km (17.56 mi) long Phase-2 connecting Ahmedabad with Gandhinagar was started. The branch line connecting to GIFT City is expected to open in early 2024