Subscribe me on: -
KZitem:- @MrCSBMedia
I will be posting about the infrastructure videos and road trip videos in my channel. I hope you like my videos in the future.
THANK YOU !!
Hashtags:-
#csbmedia
#bangalore
#chennai
#bangalorechennaiexpressway
Tags:-
bangalore chennai expressway,chennai bangalore expressway,chennai bangalore expressway update,chennai bangalore expressway map,chennai bangalore expressway project status,bengaluru chennai expressway,chennai bengaluru expressway,bangalore chennai expressway latest news,bangalore chennai expressway route,bangalore chennai expressway project,bangalore chennai expressway spur route,details of bangalore chennai expressway,bangalore chennai expressway via palamaner
Bengaluru - Chennai Expressway (BCE) project, officially NE-7, is an under construction 4-lane access-controlled road with a route alignment connecting Hoskote near Bengaluru, Karnataka with Sriperumbudur near Chennai, Tamil Nadu.
This greenfield project was first announced in 2011 and is now being developed under Bharatmala Pariyojana program. Prime Minister Narendra Modi laid its foundation stone on May 26, 2022.
Bangalore-Chennai Expressway is expected to be completed and opened in December 2025 (current deadline).
Total Estimated Cost: Rs. 17,000 crore
Project’s Total Length: 260.85 km
Main Expressway’s Length: 258.80 km
Approved Spur: 2.05 km
Lanes: 4 (expandable to 8)
Owner: National Highway Authority of India (NHAI)
Status: Land Acquisition and Financial Bid Evaluation
Project Model: Hybrid Annuity Model (HAM)
Design
Bangalore - Chennai Expressway’s feasibility and preliminary design report was prepared by Egis - BCEOM International - SECON in 2009. The report suggests the expressway will get saturated in 2029 (4 lane), 2037 (6 lane) and 2041 (8 lane).
This expressway was originally envisioned as an 8 lane road from the get-go, but was downgraded to 4 lanes in mid-2020 keeping the projected traffic in mind. The expressway will feature a 21 meter wide depressed median and all structures (bridges, culverts etc.) will be built up to allow for future widening to 8 lanes from the inside.
Proposed ROW: 90m
Proposed Carriageway: 2 x 7.5m
Total Number of Bridges: 162
Minor Bridges: 144
Medium Bridges: 9
Major Bridges: 9
Railway Crossings: 4
Number of Culverts: 143
Number of Pedestrian Underpasses: 52
Number of Vehicular Underpasses: 41
Number of Flyovers: 17
Spurs
Four spurs have been proposed for inclusion in the Bangalore - Chennai Expressway project. Within those, only Spur-3 has been approved but with a reduced length of 2.050 km. Spur-1 has been subsumed into the 280.8 km Bangalore Satellite Town Ring Road project.
Spur-1 (95.63 km): KM 14 of Expressway to Dobbaspete on NH-4
Spur-2 (3.58 km): KM 0 to NH-4 near Konadasapura (east of Bengaluru)
Spur-3 (6.47 km): KM 50.91 to Kolar Gold Fields
Spur-4 (7.44 km): KM 190.01 to Katpadi
Thank you for the courtesy: -
Do check them out: -
@dronemanYT
Негізгі бет Bangalore Chennai Expressway || Full Details || CSB MEDIA
Пікірлер: 3