Excellent explanation, good to see construction excellence, shame so few people appreciate this video, but please keep them coming.
@a-fl-man640
5 ай бұрын
impressive piece of engineering.
@alfihalma4320
2 ай бұрын
I dearly hope they will learn from that mess to reduce costs for other new reactors. €54bn for 3.2 GW is just ridiculous (16.7 €/W). Even more expensive than the mess at Vogtle (14.6 €/W). We need the Barakah values (4.5 €/W) to get things going with nuclear!
@davidharrison3173
7 ай бұрын
He’s a happy chap!
@nicksantos43
5 ай бұрын
Am I right they will be installing the steam generators through the equipment hatch and not prior to the containment building dome being placed? Seems kind of silly but I guess that is how it will need to be done in the future anyway...
@glennlee2155
5 ай бұрын
Correct. All the major components are installed using the polar crane once the dome is on..
@CyberspacedLoner
6 ай бұрын
❤
@tandemcompound2
2 ай бұрын
why didn't the CEB buy a Candu reactor?
@io9883
2 ай бұрын
Please finish the work on time and don't let the supervisory authorities act like idiots and deliberately use excuses to delay the construction.
@AllToDevNull
4 ай бұрын
And this is why small nuclear reactors are the future. If you can't transport the element on a transporter, it is to big.
@markuslang1869
10 ай бұрын
Great, looks like they will be ready 2038
@sparkiegaz3613
2 ай бұрын
After Sizewell b being built they should have carried on building another ten around the existing nuclear sites across Uk we wouldn’t be in the shite we are now, no need to import gas and be in control of our own generation not rely on France ..😊
Пікірлер: 14