This video is a sequel of "BTS 200 How to set it up" that you can find here:
• BTS 200 How to set i...
Here we observe BTS 200 while it is discharging, the fans are heard. The the connection BTS - PC is established using TDMS and its module (application) for BTS.
After that we download the results, all 8 memory banks are downloaded. While that is being done, one can see the change of voltage in time, change of current in time and in the right part of the screen we see all that in a table form.
Keep in mind that voltage change (first graph) does not reflect a standard result when testing a battery bank. Here we see voltage decrease and then back increase since we used voltage source as a simulation of the load.
An expected result of voltage change would be linear change of voltage in time. On the other hand if the voltage change was not linear but had some steep changes (steps). That would indicate a problem with the battery bank.
In the end we show how one should print out the results.
Негізгі бет Ғылым және технология BTS 200 - Test ended and how to download the results
Пікірлер