Nice job Stewart. Your video has good information. In addition, there can be a benefit to collaborating with the EOR regarding building movement anticipated "after" a framing system is installed. In some cases, this results in lesser movement than the amount shown in a project's contract documents.
@JEIstructural
4 ай бұрын
Totally agree. That’s exactly what we love to facilitate for our clients.
@user-ov4dw3yr5d
5 жыл бұрын
Thanks Man!
@geeorge
2 жыл бұрын
is there a test regime to assess the watertightness of that joint when deflection occurs?
@JEIstructural
2 жыл бұрын
There is common curtain wall water pressure testing that may be done to assess water tightness and leakage.
@gokhangokdeniz482
4 ай бұрын
What if deflection/slip track installed for the building movement and beneath storefront installed? can we consider less movement at the head. Thank you
@JEIstructural
4 ай бұрын
If deflection slip tracks are included in the wall structure (cold form steel) then the glazing system does not have to accommodate building structural movement. Thanks for asking
@JEIstructural
4 ай бұрын
This is not usually the case for long STOREFRONT runs.
@coleharris1772
Жыл бұрын
You show a calculated movement of live load and thermal to be 1.45". It looks like you are saying that is the required joint size but the joint needs to be double the movement so it would actually be about a 3" head joint. Correct?
@JEIstructural
4 ай бұрын
YES. You’re absolutely right. Sealant can only be squeezed to about 50% of its height dimension before it ruptures.
@MulughetaHailu
Жыл бұрын
thank you for this important video, is there any pdf or ppt file of this video
@JEIstructural
Жыл бұрын
Not yet
@moolavaadventure705
3 жыл бұрын
Do you have formula to compute the Shimming Thickness . Applied from back of the bracket and Faca of the Slab ? Thank you
@JEIstructural
4 ай бұрын
Please elaborate. I’m not sure we understand the question.