16x40 2 bedroom 2 bath being delivered. Have some things the builder needs to address still that needed to be done before it was delivered but they said they would take care of it. Was supposed to have the bathrooms totally completed minus the toilets, as you can see "sumtins missing Lucy". Also the bathroom doors, why install them to open so the light switches are behind the door, the doors should have swung open the other way, toward the tub and shower. Little things that they will quickly and easily cure, they are great people at TDSPortablebuilding.com
Негізгі бет Cabin Has Arrived
Пікірлер: 87