Everyone wants to “wet it up” how bout you order a flowable mix from the start.
@altonwingate6339
4 жыл бұрын
how about you find a new job if youre juat gonna bitch
@jerryperez2786
4 жыл бұрын
When your truck gets rejected you’ll be the one bitching. Order a flowable mix if you need one. It’s so easy, but then again if you don’t know how to ask. Don’t keep going thru life trying to put a square peg in a round hole. Ignorance is bliss
@jogmas12
4 жыл бұрын
Or use a pump
@mikeochoa458
4 жыл бұрын
Talk about no Slump
@transam4555
4 жыл бұрын
It's clearly could have been a rookie driver error, and not prepping the slump to the correct spec
@ReplayCentralIdiotsWork-tx6cv
9 ай бұрын
The truck driver still stood there not knowing what to do?
@prlocc1882
4 жыл бұрын
I think every mixer driver should know when a customer ask for 10 gallons you double it. Who knows what these guys ordered for him to take it that dry 🤷🏻♂️
@TheBignuts925
4 жыл бұрын
Dude just looks at his chutes overflowing like yup that's happening oh well let these guys handle it and u no after hes done hes gonna say is it cool to rince all my chutes down on the grass
@SootyMangabey.
3 жыл бұрын
Amen, once i knew the customers I was pouring for I would always leave wet.. saved time having to wait to add 20 or 30 gallons
@stalnaker576
6 жыл бұрын
Two words for ya....self leveling.
@mlr06121974
5 жыл бұрын
Looks like a load of wet base Put 30 in and blow it over the sides of the chutes. Or just put a slick pack in the mix 😆
@rubenvillarreal775
2 жыл бұрын
He didn't look like he had water in that tank
@kevinpickard7627
8 жыл бұрын
did he even wet the shute before hand looks bone dry
@tylerfox5534
8 жыл бұрын
no he didnt
@kevinpickard7627
8 жыл бұрын
+tyler fox that will be why it was sticking when we do concreting we have our barrows soaked and all the back of the mixer soked
@poopinfruz9771
7 жыл бұрын
I duno, We've had drivers forget to wet the chute but never seen this, hard to tell without putting a tool on it, but it looks like a dead batch, even if it wasnt it sure is after he added all that water
@abitacat
7 жыл бұрын
Kyle Ranger C'est
@jimbeam5560
4 жыл бұрын
It was full of dried concrete he never washed it from the last job.that's why he is a dumb Ass it must be bare steel or it will never flow
@roywilliams1416
9 жыл бұрын
just add some water driver. 10 ain't gonna touch that manhole mud. they need about a 6, 6 1/2"
@5610winston
8 жыл бұрын
They have to work within the spec and the approved mix design. Look at the near-level pitch of the chute! Look how far the edge of the form is from the center of the slab! They needed a pump or a creteveyor to drop the concrete where they need it. A vibratory screed would take it from there. If they need a higher slump, they should have gotten approval for a mid-range or high-range water reducer.
@rjg514
3 жыл бұрын
Need to wet the shoot down before you send concert down it
@SootyMangabey.
3 жыл бұрын
its so dry it wouldn't matter.
@rjg514
3 жыл бұрын
@@SootyMangabey. it would of help a little but not really with that dry shit lol
@andreacastaldi1049
Жыл бұрын
Change job truck driver....
@armouredthug5154
8 жыл бұрын
10 slump for you :P
@Bassmastr-ly5vf
6 жыл бұрын
I’ll bet it says 5 inch slump on his ticket. But yet he brings it at a zero. Get it to a 7 and let it fly.
@joeyparsley2378
5 жыл бұрын
Yep. They never pour what it says on the ticket. He should have raked down the first stuff. Guess he didn't look at it before he left
@concreteman8777
5 жыл бұрын
Shit if i know its a house slap 7 half baby no matter what
@concreteman8777
5 жыл бұрын
@captain poopy pants bro all the time
@natep.8452
4 жыл бұрын
1200 - 1300 on the meter never lets you down and hardly gets you rejected...unless its shotcrete and you didn't know
@thecorpse1970
3 жыл бұрын
i like 7 better
@scifigamin5236
3 жыл бұрын
only a ready mix driver would understand this
@dani_del034
10 ай бұрын
Order it wet if y’all don’t want problems like these
@chrisbroesky2932
8 жыл бұрын
0" slump lol. Add WATER.
@wencemedrano7243
6 жыл бұрын
CHRIS BROESKY lol
@ramblin_man23
2 жыл бұрын
Looks like they needed it dry just in that one spot though.
@prowannab
5 жыл бұрын
Am I the only one that sees the 8" gap from the form board to the bottom? If they poured it at a 6-7 it would all run out!
@FTNDrew
3 жыл бұрын
You can put plastic though. These guys are terrible
@ramblin_man23
2 жыл бұрын
They should've built it up with dirt, to keep the concrete from flowing out
@CarlosVargas-jp4wu
2 жыл бұрын
Yo could also use plywood or pegboard
@jboardy5439
2 жыл бұрын
Nope. The concrete needs loads of water. That is a dry mix
@Spoons7414
6 жыл бұрын
I’m not even there. I’m in the comfort of my own home and I still threw a shovel and stormed off.
@Tictokshorts
4 жыл бұрын
Just try being a mixer driver for a day.
@beavis430
4 жыл бұрын
Or fired everyone
@mikeprimm4077
3 жыл бұрын
Or both. Ida walked off before the first plug was cleared. No way am I raking that shit everywhere. Mixer drivers, there are some great ones, they know who they are. Then, you have the ones that cause cold joints because they're fat ass is sitting in the gas station eating, or slowing the flow of trucks down because they are gabbing. Or the ones that just don't know what in the blue fuck they are doing. Companies don't help this either, it's so hard to get warm bodies to fill the seat, that they almost help propagate the problem. No training, just "oh you have a CDL and haven't killed anyone in the last 5 months" bam! , Hired. Never seen wet concrete before? Got a CDL ? BAM ! HIRED! here's a70 thousand pound truck with a high rotating center of gravity, Show up to a jobsite where through the lack of training, you have no fucking clue where to go, what to do, then when you inevitably start getting screamed at by the finishers because now your no clue having ass is costing everyone money and time, remember to call your company and thank them for the lack of training. It's gotta be rough. Sitting in your air conditioned truck while we work our guts out. Being able to pass anything but a gas station deli. Keep whining mixer boy
@anthonyvasquez6780
8 жыл бұрын
worst Mixer Operator EVER !!!! hahaha
@HumanAnaesthetic
7 жыл бұрын
The truck driver is still standing there looking clueless til this day.
@jdiaz9759
7 жыл бұрын
😂😂
@Teadon86
3 жыл бұрын
The issue is the guy who ordered that concrete, he should have ordered a wet mix the cheap bastard.
@immortalhour3888
3 жыл бұрын
Looks like hot concrete
@ramblin_man23
2 жыл бұрын
Ain't the driver's fault
@danielhayes735
2 жыл бұрын
@@ramblin_man23 could be, depending on what the requested slump was. Could have locked the chute for them at least though.
@johnc6042
Жыл бұрын
This must be a Friday afternoon job that dispatched at 4pm😂
@Raymond-wq2bp
2 ай бұрын
😂😂😂😂😂
@jeffharper7579
10 күн бұрын
Years ago I did Foundation coating and they was pouring the floor and one new driver left the water on the hole way to job site, yeah a little to wet and had to dump it on the ground.
@johnc6042
10 күн бұрын
That’s a lot of water! 😂 I had one where a finisher turned the add valve on trying to get the sprayer hose to go and didn’t turn it off. I was watching the mix get wetter and wetter on a slab until I stopped got out and like “oh shit!”…guy denied it of course and said I must have done it. Damn crackheads
@johnc6042
10 күн бұрын
It was a mountain job so I only had like 8 yards on. 120 gallons of water! 😂
@jeffharper7579
10 күн бұрын
Oops!! We layed block and bricks and one so called contractor poured his footers really wet he called it even flow concrete but in 20 feet we used 8" on the corner leads but in the middle my boss had me mix up and batch of mortor really stiff because we use 4" block and 2" slabs and around a 1" joint on the first course, we have never seen a footer with that much of a hump in it. We poured his footers after that.
@stevenstine1120
9 жыл бұрын
Many factors could contrbute to this fail. What you dont see is how long was the trk on the job? Could be a high psi load. It could have an accelerator admix added to the load. Driver error (not knowing his slump,getting lost going to the job). High ambient temperature.
@walsh9354
6 жыл бұрын
Steven Stine have you ever worked with concrete ? Psi has nothing to do with the f** barrel
@sawltydawgchris6116
6 жыл бұрын
That is a very likely factor being that it appears to be a deck poor where is it it's a high psi usually 3000 or greater and it's possible that it contains an admix like adva which a gallon can thin the mix down equivalent to 2 gallons but will also set that mud off like a firecracker in over an hour. Often a dispatch ticketing error for sending the driver out with that kind of mix design for a ride that is so long to time it out.
@johnjimjam1234
4 жыл бұрын
Not enough water for that heat. The chute wasn’t scraped and cleaned eithee
@stevengibson2251
2 жыл бұрын
Looks to me like he forgot to pressurize his water tank. For the amount of water, he should have been adding it didn't appear to be changing the slump at all.
@ctg5376
5 жыл бұрын
Forms covers only the upper part of the slab ,in order the concrete not to run under the form they required tight mix , but not that tight. A 5" slump would be ok with a wet shute.
@SootyMangabey.
3 жыл бұрын
I've seen some mickey mouse forms in my days but that takes the damn cake... Defiantly the cheapest bid contractor.
@AQLandscaping
5 жыл бұрын
I guess the dispatcher at the plant thought he was joking when he said "give me 30 gallons"
@nyhotdogsauce
2 жыл бұрын
MAN ADD SOME FUCKING WATER!!! 30 GALLONS!!!
@5610winston
9 жыл бұрын
Rebar on the vapor barrier and wire mesh, not enough finishers, no place for the truck to discharge with enough pitch to the chute for the concrete to come down, they hadn't wet the chute down to cool it, concrete was flash setting, finishers didn't finish clearing the plug from the chute before multiple water additions. Did I miss anything?
@michaelmaxim7207
9 жыл бұрын
Your right on. 30 yrs doing that . Sad day for them
@jcanada6828
8 жыл бұрын
send the truck back and fire the driver
@5610winston
8 жыл бұрын
How the hell did they plan to get the concrete all the way to the far end of the slab? A pump or a conveyor would have been a much better way to go.
@nlo114
7 жыл бұрын
Sloppy mixer op didn't clean his chutes before pour started. 1:50 onward: Check-out the solid dried-on stuff when the camera looks up at the mix. No wonder it didn't flow.
@rustynail3159
5 жыл бұрын
I just made the same list as you did.
@Teadon86
5 жыл бұрын
Why did they order such thick concrete? Why not order concrete a bit more wet than that chunky gruel? Adding water is usually a bad idea, and more often than not the driver is not allowed to make such a decision without the plant's/mixer's permission, for if the driver makes the decision on his/her own then there's a good chance the driver will be responsible for any reimbursements. Basically, the fault lies with the buyer, possible the mixer too, who for some reason thought it splendid an idea to have some poor driver trying to solve an issue he did not himself cause. And another thing. When people are criticizing his drop I wonder if they've considered whether he can raise the truck or not or whether he is not allowed or physically capable to inch closer as to give him the possibility to increase the drop? Just figuring a bit here. I know a few people who have no way of raising their trucks to increase the drop for the concrete as to have it slide faster down the glide, yet people are treating this as the driver's fault when the thick concrete is not sliding down fast enough for their liking.
@lucasmorris5111
4 жыл бұрын
At least you didn't have our guy " to wet Chet" always shows up with a 6 slump.
@mvasqu762
Жыл бұрын
🤣🤣🤣 that's a good one. Gotta use that on one of our guys
@marcaust3077
7 жыл бұрын
add some water and mix that shit up ..2 inch slump ?
@mikedunbat8
Жыл бұрын
A lot of times when you get to the job, they are not ready, gotta wait for a tester, gotta finish with rhubarb wire, and sometimes traffic and distance, for me if I'm traveling to a job that's 30 minutes away and they want a 5, I'll take a 7 it'll work out to a 6 and if I have to wait maybe 5.5.
@txhombre9693
5 жыл бұрын
Hot ass mud!!!
@AQLandscaping
4 жыл бұрын
Good enough slump for the state job lol
@BTubbs
5 жыл бұрын
This is every driver for Argos in Jacksonville Florida! We even gotta driver named Can't Get Right!
@peytonhemi
3 жыл бұрын
In Houston we have 3 named Can’t Get Right
@VWRICH23
3 жыл бұрын
@@peytonhemi lol Tampa argos here
@mikeprimm4077
3 жыл бұрын
HA ,Argos in Port Charlotte fl .Could fuck up an orgasm. Only use them as a last resort,. Coast concrete isn't bad as far as drivers go but, dispatcher isn't too smart.. put 50+ on the ground Friday, our 5 back to back trucks showed up an hour apart. Grrrrrr
@Ratlife724
3 жыл бұрын
@@mikeprimm4077 Lol Argos is Sarasota FL is the same way! We use coast now
@johnnybenson6044
9 жыл бұрын
Put 25 gallons in it dummy!
@dakotadakota273
5 жыл бұрын
20 max if you care about it
@natep.8452
4 жыл бұрын
@@dakotadakota273 I care about getting the load out of my drum. I'll dump my whole water tank into 5 yards if I have to.
@callofthewild9175
7 жыл бұрын
Even I know that shit is too dry. I love all the technical comments from cementheads😄❤❤
@HollowPo1ntz
3 жыл бұрын
Concrete
@Jrh-rp7np
3 жыл бұрын
This must be a rookie driver cause they told him 5 gallons but on a full load and that stiff it ain’t gonna do shit he needed like at least 20 there
@HollowPo1ntz
3 жыл бұрын
Should of had a pump. And usually pours like that are a 4-5 slump this guy brought it dry af
@frankcrum3233
5 жыл бұрын
He is not when is the type that is no good it’s too thick is coming up from the side anything it’s all inside the tank it’s all jacked up how are you I see you are you my senses and into yeah you see any other hola can you Siri I Love or is it the yellow key unlock
@Supermoto686
5 жыл бұрын
Well that corners fucked. Should’ve ordered at a 5 slump
@ChavezConcrete
9 жыл бұрын
Nothing is wrong with the concrete. The driver didn't clean his shoots from the last job (ever?) so it won't slide down. Compounding it, the slope, or lack there of. Its somewhat of a flat run and the fact that the chutes have dried concrete on it and you see whats happening. The concrete guys seem like they can't comprehend what the real problem is.
@smokedpickles4471
9 жыл бұрын
You have no idea. That concrete is set.
@5610winston
8 жыл бұрын
Condition of the chutes is less the issue than the near-horizontal pitch of the chute. Concrete can't flow down the chute if there is no down there. On top of all that, look how far the center of the slab is from the edge of the forms. They need a creteveyor or a pump, and at least a half-dozen more finishers, and a vibratory screed.
@MrBat000
7 жыл бұрын
no...there is not enough water in the cement mix... thats why its too thick and not flowing down.
@ihightreasoni
6 жыл бұрын
That stuff's probably been in the drum for 45 minutes to an hour and it's already starting to kick and he should have added like 20 to 30 gallons of water right off the bat that s*** should flow out the shoot on its own without you even having to touch it at least in the beginning
@looseandsloppy2424
6 жыл бұрын
That shit is about a 3 slump which isn't going to slide down all those chutes it needs to be about a six slump. I do this stuff every single day for a living. And it's probably got accelerator in it which dries it up twice as fast.
@killaz123456789100
4 жыл бұрын
Mix was way too dry it wouldnt flow
@MrBat000
7 жыл бұрын
no experience what so ever! The cement mix is wrong and there is not enough water! all they had to do is add water to the mix in the truck....that will soften the flow. The driver of the truck is standing like a statue and doesnt have a clue. thats a complete fail.
@joekittle3407
2 жыл бұрын
Scratch that he will need more than 10 gal to fix that dry mess
@tzimiz77
2 жыл бұрын
Its a damn yard, you should make it like soup.....
@stephenprimeaux8635
6 жыл бұрын
great job, concrete going under form board
@ytrdgvsss356
2 жыл бұрын
You making a long day for them without water. ...
@jeffsiers4206
5 жыл бұрын
Batchman here. I see a few things going on here. First, we don't know how long it took the driver to get to this job, which is probably a cash job. Even 3000 PSI will start to flash if you have to travel for an hour to get there. Recover helps but it only adds a little time. Maybe the truck sat there for awhile before pouring, even though it doesn't look like that. He probably should have stopped to check his load. I'm going to go out on a limb and say this was supposed to be at least a 5, maybe even a 6 because it looks like the finisher may want to shoot the mud to the back side. And the driver should have told them to clean the chute while he was adding water. Once you see that it's dry just ask the customer if he wants a 5, and spin him up a 5. Don't depend on a slump gauge either, trust your eyes.
@sandyburns3635
2 жыл бұрын
🇨🇦 EARS , that’s how KNOW YOUR MIX IS RIGHT, 33+ years in.
@Unpluggedoutofmatrix
9 жыл бұрын
Needs to spin it up and add 20 gallons
@rhillzbob
4 ай бұрын
forgot to turn on his water pressure tank valve daa
@Belting101
3 ай бұрын
That stuffs already started going off and the more he adds water the worse it will get because he will be outta water in no time and the slump won’t change at all
@Belting101
3 ай бұрын
I’d say throw the sugar and or coke to it and caller quits
@frankcrum3233
5 жыл бұрын
We’re going to sickness I kind a love Bruce I said take that brought the truck out here imagine I have Bruce any Volvo with Willis is these are your two Hebrews and you guys look at that you guys all like no it’s a get it are you Hebrews
@frankcrum3233
5 жыл бұрын
Jelly I wanna let the Jelly for what are you doing with your satellite or you guys jelly love Jelly love
@gainsforjesus1164
2 жыл бұрын
Now why in the world would they order a 1 -2 inch ??? Argos just chillin letting them work!
@donaldcurtis9229
6 сағат бұрын
My good friend was a concrete driver deliver concrete to the address the wife said just dump it here my husband will take care of it after he gets home she signed a ticket he poured it in the driveway and left can't make these things up
@stonersville6277
3 жыл бұрын
Add water, lose a chute, pull the concrete off before it hardens, DO SOMETHING FOR GOD'S SAKE 🤣🤣😅🤣🤣😅, GOOD GRAVY.....
@jonathanturnbull2617
3 ай бұрын
UK concrete usually checked at a platform by the batcher... driver still needs to "wet it up driver" never right
@KylexSheppard
4 жыл бұрын
good ol 1 slumper
@ericswain70
7 жыл бұрын
soup'm up
@Kydenhall
11 ай бұрын
Jeez what mix is this. He doesn’t even hold that much water most likely. And thats coming from a guy who carries 2 tanks on his truck. Batch mixer needed to add more aqua
@timnorman3575
10 ай бұрын
I drove a mixer for a few years. I always hated going to a Job where they lacked in experience or not prepared.
@timothyabraham4246
3 жыл бұрын
Damn where was the verfia at for this truck bc he clearly can't slump this
@TJP_GAMER
7 жыл бұрын
looks like hot mud to me. timed out mud just gonna eat the water
@ravemaster7405
9 ай бұрын
What slump did they order the mud at? i've been on jobs with 10 yards where they order it at curb mud level and then they tell me they want a 6 inch slump and they got 1 percent in it. I'll add a gallon of super and add it onto their ticket whether they like it or not and throw 25 gallons in it.
@bigolow641
Жыл бұрын
Let’s arrive at a job with hand curb slump, driver should of known better.
@ansarullah1576
Жыл бұрын
Me Mixer truck driver my from Bangladesh I'm interested job
@devilmonkey
7 жыл бұрын
to dry, should have no problem flowing at that pitch.
@benclarke3880
9 жыл бұрын
Looks like a hot mix, your order was added to what was left in the bowl from the previous customer, makes the mud turn real quick, add atleast 10 litres per cubic meter to that and spin it up for Atleast 4 minutes, judging by the size of that slab you had 2-3 trucks?
@manuelmunguia3719
Жыл бұрын
I would of sent that concrete back, why would he let them accept that junk. amazing.
@darrylpreston4974
2 ай бұрын
I would’ve sent it back! By the time they get mix right it’ll be to late and lost
@markrohrer4446
6 жыл бұрын
The blind leading the blind. The three stooges
@mauriciomorfin2221
3 жыл бұрын
Send me some concrete, go easy on the water, go crazy on the gravel.
@javiergomez7290
3 жыл бұрын
Hahaha stupid concrete guys, the driver mixing the concrete without adding any water, llol
@jeffcaffrey70
Жыл бұрын
It’s not the concrete truck driver fault that isn’t flowing it’s because it’s too dry. The only thing he could if done different is wet his chutes before hand
@Grizzle_Uno
9 ай бұрын
😂 making the migos work extra hard
@markcrawford8876
4 жыл бұрын
Everything in the lense of this camera is wrong. On the upshot, these guys and that form can always be used as a bad example!
@Midnitexowboy
Жыл бұрын
Of course you have all the so-called expert that are going to make a stupid comment because they all started off as experts
@dacodamitchell1453
3 жыл бұрын
Up here the drivers show ya what they got and if it’s not up to what ya want they stop and spin the shit outta that drum til ya like it. Feel bad for those boys I woulda said fuck you im out lol
@Drummer81able
3 жыл бұрын
The concrete truck have water and pump..add it! Or use latex. Thats too dry.
@alejandroruelas9574
Жыл бұрын
This happened to me today I didn't understand why ,, only on one of my loads ,,you live and you learn
@keng3328
4 жыл бұрын
Clueless mixer driver, chutes were caked in dried concrete. The guys placing it aren’t any smarted either
@14PANCHOKID
3 жыл бұрын
Damn that’s sad 😞
@johngiroux1661
9 ай бұрын
That was dry as hell. Like a 2 or 3 inch slump.
@capricornx7361
8 жыл бұрын
thats a bullshit slump wtf
@vortecmaxxx
8 жыл бұрын
antonio bennett lmao
@robertambrose5348
4 жыл бұрын
It's not the cement truck driver fault is actually the finishes fault
@rjg514
5 жыл бұрын
Put another 80 gallons in it and blow it out make white capes
@rjg514
3 жыл бұрын
First Mexicans I've seen that didn't know how to pour concrete 😳
@tylerfox5534
9 жыл бұрын
If you guys would please subscribe for more videos
@scoreash78
Ай бұрын
Why can’t he add water at least 40 gallons?
@joekittle3407
2 жыл бұрын
Charge the drum add 5 to 10 seconds water I bet it's to dry
@konradkusmierek7202
Ай бұрын
But... I i fight for my mixer. Look at him
@eag1463
5 жыл бұрын
No Mamés 🤦🏼♂️
@99hilux6
5 күн бұрын
Throw some sugar in
@lorenzoboyd6889
4 жыл бұрын
They will be finished by sundown - tomorrow.
@idessaoutlaw
2 жыл бұрын
Blind leading the STUPID 😎👌
@tylerfox5534
9 жыл бұрын
Hey guys please leave a like down below
@DosDonts101
6 жыл бұрын
bad mix dude start over - i would be so pissed if they poured that garbage as a foundation
@123TauruZ321
5 жыл бұрын
What would you say to them ^^
@stonersville6277
3 жыл бұрын
Wet the chutes beforehand and during, geeeeeeeez
@jasonharper2601
3 жыл бұрын
STUFF IS GOING TO BE SET UP BEFORE THE POUR IS DONE