This evolution requires one Engine Company with four members, an engine mounted monitor and supply line. This timed evolution begins when the Engine stops, airbrake is applied.
Standard requirements:
Crew will have predetermined fire location target chosen, simulating a large fire on a second story balcony (the area, tree, side of building etc. needs to be chosen as the engine operator will have to be accurate with the deck gun.)
The Engine Company stops at the fire scene and 2 members will hand jack 100’ of 4” and secure a hydrant supply.
The Engine Operator will deploy and charge the monitor off tank water at the proper discharge pressure.
The Operator will note how much water is used before accuracy is achieved on the “fire.” 10 seconds on the fire is minimum with tank supply.
When the supply line is charged the Operator will switch over to hydrant water.
Recommended maximum time for the evolution is 3 minutes.
Негізгі бет CPE #5 Monitor Tank supply to Hydrant
Пікірлер: 1