Brilliant! Thanks for posting. This is how KSFO could be improved.
@obsun001
6 жыл бұрын
Such a huge project, strict environmental compliance & tight completion schedule!
@DoWong
7 жыл бұрын
Good, can't wait until this mega project is been realized.
@geomodelrailroader
5 жыл бұрын
almost done this is also how the airport itself was built but back then they did dredge, fill, cap, and pile drive. Today they can skip dredging since the soil is contaminated silt from construction of the airport itself all they have to do is place a mat on top of the silt cover it with sand and then drill the pilings. It should be done by July 2020. While this is going on construction of Terminal 2 and Concourse 4 are complete all they have to do is connect them to the system and the new runways.
@petrivatanen9017
Ай бұрын
Runways lento kenttä terminal Adu Dhab international airports Adu Dhabi lento aseman terminalin laivanoijenen sataman nostonurijeeinen terminalin tuotteetidenen valmistetaanjaanan pahaokuksen tuotteetanton tedatas tarvikkeeta kuuluuijetsunust kuorman Autoijeeneeneenen lavansen noston silita perän veton konkku ja varsieenen sakcian vaunuinijeeneeneen noston silita DHL Excellence simply delviered Express dolba terminalin asfaltti aseman terminal betoni tuotteetidenen valmistetaan pahaokuksen tuotteetanton ammattilaisten suutteenlijan Kevin Dixon engenneiro projectista da auto estrada North lantau director runways arkigettin tekijän Petri Mikaelnen vatanen
@reanult457
5 жыл бұрын
On schedule and within budget, you must be kidding.
Пікірлер: 10