Station Setup
Point Collection in DR mode
Line joining
Area Calculation
Subdivided a line
Offset
Trimble C5/C5HP/S5 ELECTRONICS TOTAL STATION USER MANUAL
Power on the instrument → after complete the centring & levelling through Tripod and Tribrach→ go to Trimble Access S/W →
Wait until the machine is not open properly →
Create New Project & New Job→
If you working on a single area than click on the area name / Otherwise click on New Project → Give the project name → Enter → Accept.
Job create
Then Job → New Job →Input Job name → enter →accept →
Go to the Instrument symbol and click on level → Level it precisely using Foot-Screw on Tribrach →
For Station Setup………….
Then go to Measure → station setup→ Click on arrow then go to list and select point (If coordinate already record ) otherwise key in and input coordinate directly. → In the back sight measurement Click on arrow then go to list and select point (If coordinate already record) otherwise input Azimuth (0) → Enter → See back sight and measure→ Store/Accept.
For Topo Points Measurement………….( DR Mode & Circular Prism Mode)
Then go to Measure on Menu → measure topo → input point name → input Prism height/Target height then measure and store the coordinate.
To view the all Coordinate
Go to favourite → Points manager (You can see all Points N, E, Elev. value).
For Continuous Topo Points Measurement………….( Using 360o Prism Mode)
Then go to Measure on Menu → measure Continuous topo → Change the 360 Prism mode → Click input first point name → Code→ input Prism height/Target height → Select Method (Stop & Go) then measure and store the coordinate.
Stake out
Click on stake out → Point → if it is showing no data go to add then select all points (if data is already recorded or import) otherwise click on arrow and select key in → Input point name and N,E,Z → enter → stakeout → delta H angle should be 00°00’00” → measure the prism when distance will 0.00m that your point .
COGO
For distance measurement → Click on Menu → COGO → Distance Measurement → Between Two Points → Select the first point from list → Select second point from list →
For Area Calculation→ Click on Menu → COGO → Area Calculation → Select all area points → Calc.
Resection (Instrument will setup on the base of Two Known Points)
Set up instrument in unknown point → Go to Menu→ Measure → Resection → Give the Point Name of the station → Height of the instrument → Store →
Sight the first known station→ Put Coordinate / select it from list → Accept→ Code → Prism Height → Measure→ Store
Sight the second known station→ Put Coordinate / select it from list → Accept→ Code → Prism Height → Measure→ Store
Check final result → Result → Accept → Store → Station setup completed.
Data Backup (Through Pendrive)
Open the Project first → Open job (Where you want to take backup) →Export → Attached Pendrive and check it is supported or not → Select format (which format you want to take backup..dxf/.csv) →Select folder option on file name → Select USB Drive (1 pop up window will came → Yes) →Select Data Folder through direction button → Click on Select → Accept→ Select USB Drive and Data Folder again →Select all points → Accept.
Data Backup (Through Data Cable and PC)
Attached data cable to your ETS and USB side attached with your PC → Go to Job → Export →Export data format to your system memory → Select the data from Trimble Data → Project → Copy it from system memory and pest it on your PC.
For create Feature Library
Go to settings on Menu → Feature Library → Survey → Edit → Add → Give the feature Code Name → Description → Feature Type (Point) → Layer (0) →Accept.
Create another Feature Code and follow previous → Store is mandatory.
To activated Feature Library
At the time of Survey select code and Survey → Select the option from drop down menu and click on it.
Негізгі бет Details Survey & Calculation of Geometry (COGO) in DR mode using Trimble C5 ETS
Пікірлер: 8