Large facilities have a complex design for Diesel Generator Backup Power. Dated Equipment will often not have the proper lableing or Arc Flash Study paper work still in tact with the equipment. Safety is at the forefront with this level of power.
NFPA 70E, Section 130.5 Arc Flash Analysis - requires an arc flash risk assessment shall be performed to determine the risk, safety related work practices required, the arc flash boundary, the incident energy at the working distance, and the PPE that people within the arc flash boundary shall use. This assessment shall be reviewed at intervals not to exceed 5 years.
Негізгі бет Diesel Generator Safety Alert: Don't Ignore the ARC Flash Study
Пікірлер: 9