Drill and blast method is a common practice used in the rock excavation. The cyclic nature of this method requires good work site organization. Fuzor produces detailed sequence animations to help the workforce to better understand the works ahead and highlight the potential challenges before going to the site. This video illustrates the Brill and Blast sequence.
If you would like to know more about Fuzor, please feel free to contact us at www.kalloctech...
Fuzor tools applied: Material Library, Content Library, Graphic Settings, 4D Simulation, Sequence Animation, Fly Through, GIS, Visibility Override, 3D Location Marker, Multi-Track
Keywords:
#Fuzor, #VDC, #AEC, #construction, #constructionsequencesimulation, #aecsoftware, #4D, #4Dsimulation, #constructionsequenceanimation, #virtualdesignconstruction, #4Dworkflow, #5D, #tunnel, #NATM, #Drilling, #Blasting
Негізгі бет Drill and Blast Sequence [Fuzor Method Statement]
Пікірлер: 7