This video takes the viewer step-by-step through disassembly, inspection, and reassembly of the Flowserve Durco Mark 3 ASME chemical process pump. Sections include:
• Disassembly
• Power End Assembly
• Power End Inspection
• Wet End Assembly
• Impeller Clearance Setting
• Mechanical Seal Installation
Негізгі бет Ғылым және технология Durco Mark 3 ASME Chemical Process Pump Maintenance
Пікірлер: 19