Very informative sir. Thanks alotl. Please share vlogs about all accessories such as expansion tank, make up water tank, Chiller valve Package and Flushing process etc. These are out of the topic but try to explain. Thanks alot sir.
@talhasyed8358
6 жыл бұрын
I dint get any reply. Please reply and try to explain above topics.
@mohammedshahbaz8861
5 жыл бұрын
Thanks bro🤗 plz make more 😊
@shrikantsarode5613
7 жыл бұрын
Good information sir
@shaikhfayaz6839
5 жыл бұрын
Sir can u plz make a video when there is less noise around ,or u can edit outside noise
@lokesha.v2177
4 жыл бұрын
Keep posting these important videos bring out some more belonging Chiller and ahus ..I wanna know about your personal opinions abt my carrier sir pls guide me ,am lokesh n am working as an hvac technician in facilities so i would like to know more abt hvac specially chiller and ahus so can u pls guide me which is the best course to get good knowledge for that .???
@ahnafahmad4183
5 жыл бұрын
Thanks sir
@shazinefazil7413
7 жыл бұрын
Is a DRV required when we provide a PICV?
@HVACSystemMaster
7 жыл бұрын
Not required in general but as some project specifications include such demands from clients.
@mjmohamedjaris6027
6 жыл бұрын
@@HVACSystemMaster OK sir but the outlet of chilled water is controlled by what I think it's must be picv Drv is used for maximum water outlet is that right I saw a video McQua air cooled chiller at the last part of video you told picv valve is yet to be fixed that is fixed in return line
@shirazkhan2846
2 жыл бұрын
U didnt mentioned about di electric union
@fazlumd.1058
Жыл бұрын
সালামালাইকুম ভাই এটা কোথায়
@Asraah_world
5 жыл бұрын
Which material is used here for insulation & cladding
@aissabousekri7665
7 жыл бұрын
thank you sir if you can explain moron the chiller
@shaikhmudassirazmi6934
7 жыл бұрын
Sir what is the use of expansion tank in plant room and where it is exaxtly located?
@mraa07rmchannel
4 жыл бұрын
Your voice sound low and noise level heigh
@shaikhmudassirazmi6934
7 жыл бұрын
Sir why bypass line is provided? If pressure independent valve is provided then why double regulating valve is provided?
@HVACSystemMaster
7 жыл бұрын
SHAIKH MUDASSIR AZMI This Project is for Dubai Municipality and they will connect the system with BMS through PICV and want to have both DRV and PICV. In general it is not recommended to have both the valves as one is sufficient. But here client have different demands that I as a consultant need to provide them.
@touseefahmad4834
7 жыл бұрын
sir i want to know why you have installed bypass line with isolation valve?
@HVACSystemMaster
7 жыл бұрын
touseef ahmad it is used for testing and commissioning purpose in preliminary stages of flushing. When you need to exclude the valve package and machine and only need to flush the pipe routing then u can just bypass it.
@arishalam6102
7 жыл бұрын
it's good sir which project is this I mean which country ?
@HVACSystemMaster
7 жыл бұрын
arish alam can't mention the name of the project but it's Dubai.
@shaikhmudassirazmi6934
7 жыл бұрын
Sir why we provide bypass line please explain?
@kafilakhtar2819
7 жыл бұрын
Sir, what it the purpose of various test point
@HVACSystemMaster
7 жыл бұрын
Kafil Akhtar Test Points are used in testing and commissioning time when the third party brings their own instruments and mount on those test points to check whether the systems own equipments installed are performing as they are designed for. Basically for a result comparison between the original system equipments vs calibrated 3rd party equipment.
Пікірлер: 27