Bridge piers along the Interstate-40 were damaged by corrosion. FRP Repair System was used to strengthen the columns without adding more than a quarter-inch in diameter to the piers.
- Күн бұрын
FRP Retrofit of Bridge Piers Subjected to Corrosion Damage
- Рет қаралды 2,852
Пікірлер