Waimea Community Dam engineers Damwatch Engineering Ltd designed solutions to overcome the shear zones found at the site and to waterproof key parts of the dam. Solutions included the use of a geosynthetic membrane.
Waterproofing specialists Carpi Tech designed, supplied and installed a geosynthetic membrane solution in the spillway approach channel floor and side wall, along the parapet wall on the dam's crest and to seal the plinth junction with the concrete face.
Watch this video to learn more.
Credit to Damwatch Engineering and Carpi Tech.
Негізгі бет Geosynthetic membrane installation at the Waimea Community Dam
Пікірлер