A 95 meters long and overall 592 tons heavy formation transported a 260 tons heavy transformer from Leer to a distribution station near Conneforde, Germany. For this, the High Girder Bridge of the Kahl Heavy Haulage corporation was applied. The transformer came by a barge on the Ems river ( • Anlanden eines 260-Ton... ).
This is part 2 of a threepart series about the transformer transport from Leer to Conneforde:
◾️ Part 1: Unloading the transformer off the barge: • Anlanden eines 260-Ton...
◾️ Part 2: Departure of the 592 tons heavy Transformer Bridge
◾️ Part 3: Conversion of the Transformer Bridge: • Schwertransport: Umbau...
Subscribe: / @hd1080ide
Facebook: / hd1080ide
Twitter: twitter.com/HD1080ide
Негізгі бет Heavy Transport - 600 Tons get stuck | High Girder Bridge
Пікірлер: 728