@williamodela
Жыл бұрын
This is very helpful for decentralized wastewater management. Thank you.
@wateracademy5866
Жыл бұрын
You're welcome
@chitramypower4344
20 күн бұрын
Please upload the SBR, MBR, ASP, RO/ UF, DM plant process and design calculation
@siciidckallaale9569
Жыл бұрын
Very outstanding and helpful video, more thanks to you.
@wateracademy5866
Жыл бұрын
Thanks for your feedback 🙏
@victorcutinho1052
6 ай бұрын
Wonderful explanation. 👍🏻
@wateracademy5866
6 ай бұрын
Thanks 🙏
@mostafaabdelrauof3185
6 ай бұрын
so why Stabilization Ponds are used , and does it come before or after this process ?
@wateracademy5866
6 ай бұрын
Stabilization ponds are not typically used with MBBR
@shen-yenjen961
Жыл бұрын
better way can treat waste water
@raulsalazar2994
11 ай бұрын
how about MBR TYPE
@wateracademy5866
11 ай бұрын
There is a lesson about MBR kzitem.info/news/bejne/wpx3lpaPsoqmoYo
@mohammadheidari3082
9 ай бұрын
I think here is some mistake or maybe I am wrong,, I do not think there is any need for a secondary clarifier with MBBR. So the flow scheme seems wrong!
@wateracademy5866
9 ай бұрын
Hello dear, All MBBR schemes are followed by a clarifier, that is designed differently from the activated sludge process. Water definitely needs to be clarified through sedimentation after the MBBR stages.