#civilguruji #civilengineerstraininginstitute #practicalsitetraining
How to Perform Excavation According to CPWD Norms?
Call On:- 9111001234
Get Site Practical Training :- www.civilguruji.com/s/store/c...
Practical Training course & Fee Detail:- • Practical Site Trainin...
Branch Address :-
1.BHOPAL Civil Guruji :- At Hind convent school Naveen Nagar, Bhopal, Madhya Pradesh 462010
maps.app.goo.gl/UhHyHpBzNJRYd...
2.DELHI - NCR Civil Guruji - 25, gate no. 1, behind kailash hospital knowledge park -1 Greater noida (201308) Nearest Metro station : Pari Chowk.
goo.gl/maps/a2TpSDCCGiRYxEb19
3.LUCKNOW Civil Guruji :- At Prayag public school Sandaulli Umarpur ,Near Juggaur railway station road, Lucknow 225003near goel tower,
maps.app.goo.gl/bxWdfd36j9TTE...
4. NAGPUR Civil Gueuji :- Karmaveer Dadasaheb Kannamwar Engineering College KDK College Rd, Opposite Telephone Exchange, Nandanvan, Nagpur, Maharashtra 440009
maps.app.goo.gl/URejiAmmVSqjJ...
About This Video :-
In this video Er. Vivek Kumar Pandey discuss about, How the process of earthwork is executed in all kinds of soils, according to CPWD Norms|With complete CPWD specification DSR details.
Burjis: Short pillars of brick/ stone having top surface finished with cement plaster for marking etc.
Formation or Profile: Final shape of the ground after excavation or filling up.
Foul condition: Filthy and unhygienic conditions where physical movements are hampered such as
soil mixed with sewage or night soil.
Lead : All distances shall be measured over the shortest practical route and not necessarily the route
actually taken. Route other than shortest practical route may be considered in cases of unavoidable
circumstances and approved by Engineer-in-charge along with reasons in writing.
Carriage by manual labour shall be reckoned in units of 50 metres or part thereof.
Carriage by animal and mechanical transport shall be reckoned in one km. unit. Distances of 0.5 km. or
more shall be taken as 1 km. and distance of less than 0.5 km. shall be ignored. However, when the
total lead is less than 0.5 km., it will not be ignored but paid for separately in successive stages of 50
metres subject to the condition that the rate worked on this basis does not exceed the rate for initial
lead of 1 km. by mechanical/animal transport.
Lift: The vertical distance for removal with reference to the ground level. The excavation up to 1.5
metres depth below the ground level and depositing the excavated materials upto 1.5 metres above
the ground level are included in the rate of earth work. Lifts inherent in the lead due to ground slope
shall not be paid for.
Deadmen or Tell Tales: Mounds of earth left undisturbed in pits dug out for borrowing earth
Safety rules: Safety rules as laid down by the statutory authority and as provided in National Building
Code (NBC) shall be followed.
Негізгі бет Ғылым және технология How the Process of Earthwork is Executed in all kinds of Soils, according to CPWD || By Civil Guruji
Пікірлер: 20