Part 2 - In this the second detailed tutorial, we walk you through setting up a post-and-beam system, starting with locating the control point for the left post as part of a two-post structure. We demonstrate how to find the correct position for the second post. The process involves squaring up the wall and the slab to ensure the posts are perfectly aligned with the house.
We also cover the essential steps of drilling holes in the concrete slab to attach brackets securely, which will support the posts. Special attention is given to measuring and cutting the posts accurately, and ensuring the through bolt holes are aligned perfectly using an internal clip for precise drilling.
Additionally, tips on maintaining a flat and perfectly laid out main framing, even on a sloped slab, are shared. The method involves setting posts at the correct height and using a string line for exact alignment.
The video also touches on installing trusses and securing them with screws, emphasizing the simplicity of the process without the need for notching.
Негізгі бет How to Install a Renaissance Aria Patio Roof system (part 2)
Пікірлер