Mark one side of the hip or ridge and chalk a line. When doing a hip, always start installing the caps from top to bottom.
Line up your caps on the chalk line and nail them snug into place. 2 nails per cap, 1 on each side. The next cap will slide into the lock on the previous cap. Tap it into place and nail it.
The starting and ending caps are bent over the gable or drip edge flashings. The final cap is fastened with a rubber grommet screw.
If installing a ridge vent, install silicone on both sides and nail the ridge vent material on top of the shingles. Install the caps on top of the ridge vent.
#ridgecaps #hip #permalock #metalroofing #aluminum
Негізгі бет How To Install Hip & Ridge Caps
Пікірлер: 1