Bill Pepoon, Managing Partner at Construction Science and Primavera Scheduling, explains how Total Float is calculated in a CPM schedule. Total Float is determined by two algorithms: (1) the Forward Pass, and (2) the Backward Pass. Bill demonstrates both algorithms in this short video.