Thanks for that. There is even a recognisable length of trackbed emerging and once they divert the A429 they will be able to join several sections up..
@SeanDavies-u5t
6 ай бұрын
Always enjoy your updates mate. Thanks for making the effort and pls keep em coming. Fascinating to the progress on some of these projects 👍
@mikehindson-evans159
6 ай бұрын
Another excellent update on the section of trackbed north from Kenilworth today. Nice catch of the two four-car XC Voyagers at 3:59 as they head south across the new (future-proofed twin-track) overbridge. Also great to see how "Mother Nature" is already healing the scars.
@davecooper3238
6 ай бұрын
Thanks for the update. It looks as though the rail bridge is wide enough to re-dual the track.
@josephdimambro-denson
5 ай бұрын
It's something the county council are considering.
@davecooper3238
5 ай бұрын
@@josephdimambro-denson Thinking on I could have been wrong about dual track. If I remember correctly Kenilworth/Berkswell Station was a single track branch line carrying very little traffic. I used to cycle across it in the late 1950s.
@josephdimambro-denson
5 ай бұрын
@@davecooper3238 I belive the county council are considering dualing sections of track to increase frequency on the line between leamington spa and Coventry. They're also investigating creating a new station on the line to better serve Warwick uni. The only reason few trains use it is because the single track line has very low capacity for trains per hour in each direction.
Пікірлер: 9