As per ASME BPVC Section I PG-99. After a boiler has been completed it shall be subjected to pressure tests using water at not less the ambient temperature, but in no case less than 70 degrees Fahrenheit. Even though this is construction code I use this as reference anytime I have done a Hydro.
@dicelabiblia7461
2 жыл бұрын
Great videos, great company, great people, thank you for sharing and educating us.
@wareboilers
2 жыл бұрын
Our pleasure, thanks for the kind words!
@baghdadirizzi5460
4 жыл бұрын
Thanks for the video .Responsible for pressure equipment in my factory, I would like to know how to test a fire tube boiler and which parts must be tested. Thank you for your help.
@wareboilers
4 жыл бұрын
Glad we could help. Thanks for watching!
@Asfiqbl
2 жыл бұрын
That's what he said
@lifeistoshorttolookback
5 жыл бұрын
Why, city water it's hard water. I was thought use the feed water Maybe because it's a rental?
@wareboilers
5 жыл бұрын
When hydro testing, you are just pumping the water in for pressure. It would then be drained before firing so that none of the minerals from the hard water would deposit on the tubes. Hopefully that clears that up. Thanks for watching!
@madayanmuttal886
4 жыл бұрын
He never answered the pin hole leak detection method
@paulnicholson1906
Жыл бұрын
A pin hole leak would be evident by quite a lot of water spraying our at MAWP if you look inside.