You need to run extra electrical wiring alongside the dosing pipe that goes from the pump and up the feedhead system.
To do this, plug the orange cable from the front of the pump (second input from the left) and into the electrical cable 'timer' box. Then, a black wire goes from the other end of the timer box and is plugged into the hard feed system to sense when grain gets fed and align MYLO dosage with grain distribution.
Other considerations covered include:
- Discuss where the drum and pump head belongs and figure out what type of feed head they have in their dairy.
- Feedheads have clutches on them. Hook the clutch into the F2 output. Make sure it gets plugged into a 12 vault connection, not 240 watt, otherwise the wiring will fry and the pump won't work.
Негізгі бет Installing a MYLO® pump - Part 13 - Electrical wiring and Summary
Пікірлер