The concrete pour turned up a day early.
Me and Kate rushed it in as best as we could into the dark evening/night. Luckily, this morning the ground is not frozen so I think we’ve got away with it.
Next time, get some hired help. This is a 4 man job really.
One to pour.
Two to pull the concrete.
One to tamper, assist and observe levels.
And there is a big tidy up afterwards of edging, tools, machines, site. The cleanup took me a weary hour on my own.
Wear gloves. I took my gloves off for an hour and nearly lost all the skin. (I never learn).