Learn to operate a bulk haul feed paddle wagon from Ledwell to optimize unloading capabilities.
To get started, walk around the entire trailer to inspect the following:
Overhead and ground obstructions
Hydraulic Valves in the neutral position
Hydraulic and Air Hoses
Lights
Wheels and Tires
Remote control
TO LOAD:
Pull up to the mill and position as needed.
Check that your bottom doors are closed.
Open the top doors
Fill the bins of the trailer.
TO UNLOAD:
Engage the PTO
Push out and raise on the remote to move the discharge boom away from the trailer
Use the remote control to position the discharge over the silo.
Push paddle boom on
Push floor on
Open the bin closest to the rear - remembering to unload from back to front.
Leave each door open as you move forward.
Check the discharge gauge - it should be around 1100 to 1200 PSI.
Check the floor gauge - it should be around 500 to 600 PSI.
Adjust the floor's flow control to achieve 1100 to 1200 PSI on the discharge gage - the PSI will vary on feed type.
As the bin empties, the pressure will drop on gauges - this is how you will know to open the next bin.
Once all bins are empty, Push floor off.
Push paddle boom off
Push lower and in to place the paddle boom back in the saddle.
Make sure to close all bottom doors.
For more information, scan the QR code at the front of the trailer or visit ledwell.com/
See index of operational videos - bit.ly/2wxwWda
**********
Subscribe and hit the bell to be notified when new videos premiere - bit.ly/2POTMDS
**********
CONNECT WITH US
FACEBOOK - / ledwellandson
INSTAGRAM - / ledwellandson
LINKEDIN - / ledwell-&-son-enterpri...
TWITTER - / ledwellandson
Негізгі бет Ledwell Operational Series | Paddle Wagon Bulk Feed
No video
Пікірлер