Crossing info:
Track: Serengeti Express Theme Park Line
Signals owned by: Serengeti Express
Bell timing: Bells ring til the gates rise
Right signal:
Bell: NEG Electronic Bell
Lights: Two pairs of Dialight 12x24 inch LED Lights
Light Plugin: Safetran
Gate Mechanism: Safetran
Gate Lights: NED LEG Gate Lights
Base: Safetran
Left signal:
Bell: NEG Electronic Bell
Lights: Two pairs of Dialight 12x24 inch LED Lights
Light Plugin: Safetran
Gate Mechanism: Safetran
Gate Lights: NED LEG Gate Lights
Base: Safetran
This crossing was installed in 2010 when Cheetah Hunt was being built. This crossing has lights, bells, and gates. In 2021, one of the NEG e-bells was missing on the left signal, then a few months later, another NEG e-bell was installed. In August 2023, the gate lights were added, and apparently, it made the lights flash incorrectly on both signals, and Serengeti Express hasn’t fixed it yet.