Drone video of the construction of Lot-1 on the Botevgrad-Vidin road in the section between Botevgrad and Lyutidol.
The route in the part between Botevgrad and Novachene is ready - construction works are currently being carried out for temporary connections to be able to start using this section before the completion of the entire Lot-1.
At the beginning of Lot-1 (near Botevgrad), a two-level road junction is to be built.
The 19.32km section (from km 174+800 to km 194+122) starts from the Botevgrad ring road and ends before Lyutidil (from where Lot-2 starts).
The road will be two-lane with two lanes in each direction, with a gauge of 20 m. The construction of agricultural overpasses, recreation areas, etc. is planned.
The construction and design is carried out by the association "GEOPAT LOT 1", with participants: "Geostroy" and "Pathstroy-92".
Contract value: BGN 159,599,935.27 including VAT
Construction contract: No.RD-33-12/18.10.2019
Term for design and construction of the road section: 1096 days, of which 180 days for design and 916 days for construction.
Warranty periods:
for facilities - 10 years
for road part - 5 years
Construction supervision: "Mezdra Consult" DZZD, with participants: "Transconsult - BG" OOD and "Rutex" OOD.
Contract value: BGN 1,476,000 including VAT
Contract for construction supervision: No. D-122/18.10.2019
Archaeological studies: National Archaeological Institute with a museum at the BAS.
Contract value: BGN 491,722.00 including VAT.
Contract for Archaeological Surveys: No. D-8/12.02.2019
#mezdra #vraca #botevgrad #bulgaria #roads
Video: Mezdra-Botevgrad road reconstruction
Date: 11.05.2024
Music by Bensound.com/royalty-free-music
License code: EWRHEZEYBN85XYVA
Music: bensound.com
License code: 8D5X4HIZ191Y5BLA
Redistribution is NOT allowed. Any reproductions or distributions of content elsewhere is a violation of the license under which this video is available on the KZitem platform
Негізгі бет Lot-1 from Botevgrad - Vidin / Bulgaria (11.05.2024)
Пікірлер: 68