Taking our Corridor Design from the previous video and grading out the lots within our subdivision, we try to adhere to a minimum 2% slope while dealing with other lot interference's. We modify our assemblies slightly to allow for easier grading.
- 4 жыл бұрын
Lot Grading a Residential Subdivision
- Рет қаралды 13,242
Пікірлер: 14