CORRECTION SORTA: *When I say they use 76 varients of the Alstom Ciradis I meant they have 76 Ciradis Trams with several different varients.
@Myrtone
5 ай бұрын
Some are 70% low floor with pivoting end bogies and fixed centre bogie, while others are 95% low floor with only fixed bogies. The E class Melbourne tram, however, is also 95% low floor but with four pivoting bogies as is Gothenburg's M33. The upcoming G class will be 95% low floor again, with pivoting end bogies and fixed centre bogies.
@seansoraghan3245
2 жыл бұрын
Dublin needs a metro
@Myrtone
5 ай бұрын
Why not extend the DART underground?
@ryancarroll3957
3 ай бұрын
@@Myrtonethat was the original plan. But we don't finish infrastructure projects here. Dart and metro were to match up. Never happened In fact the original dart plan was for two lines, one on the coast and one partially underground to west Dublin. Never finished We have a planning system that lets evert bust body neighborhood nimby object it makes projects impossible to finish
@joshuaW5621
Жыл бұрын
As an Irish man myself, I appreciate the attempts at pronouncing the names of CIÉ and the places.
@retrocd7991
10 ай бұрын
CIE - Cycling is easier
@patchso
6 ай бұрын
Thoroughfare should have a go at all the pronunciations just to give his Irish viewers a laugh :-)
@Andrewjg_89
2 жыл бұрын
Dublin as the Capital City of the Republic of Ireland does have good transportation. And the Luas trams are very nice as well. Great video 👍
@Thoroughfare
2 жыл бұрын
Thanks!
@samkendlinhobbs8494
2 жыл бұрын
As somebody who lives I can attest that it most definitely does not have good transportation. It’s usually quicker to walk anywhere between the canals than the tram, and cycling is always quicker Good video though!
@Thoroughfare
2 жыл бұрын
@@samkendlinhobbs8494 Thanks!
@stephenmurphy2212
2 жыл бұрын
@@samkendlinhobbs8494 Agreed. The government can’t even get the underground metro built. 🚇
@tarlavos7301
2 жыл бұрын
As someone who lives in Dublin City the transport is awful its impossible to rely upon it and good luck tying to get anywhere on the weekends
@deividasverbickas6233
9 ай бұрын
If you ever want to use the LUAS, do NOT use it at rush hour, kinda an obvious thing with transport but still, you will packed like sardines!
@derlaurenz
4 ай бұрын
The fact that it took so long to connect the two lines seems to me, somehow being, unfortunate planning ... sts
@Thoroughfare
3 ай бұрын
Whilst I can't really speak on the efficacy of their planning. They have being doing some interesting stuff with redesigning the bus network in Dublin recently, which might help transit overall. Thanks for the comment!
@sglenny001
Жыл бұрын
Providing retrospective but an system similar to the tyme and wear metro might of been better suited
@Runboyrun89
11 ай бұрын
The intention was for Metrolink to go further south and “takeover” the Green Line south of Charlemount to Sandyford (which is now a large urban area in its own right which a lot of EMEA HQs such as Microsoft). The Green Line is already at capacity. That was scrapped though because people didn’t want the line closed. I think now it is likely that Metrolink will extend south to Donnybrook/Ballsbridge - UCD - Sandyford. I think we will likely see as well DART Underground revived and extended to Poolbeg which would provide a further heavy rail link East to West. The lack of any construction in 6 years since the LUAS was extended is unacceptable though- a city with a hell of a lot of wealth and growing rapidly. A legacy of the financial crash.
@sglenny001
11 ай бұрын
@@Runboyrun89 intresting
@simeranand
2 жыл бұрын
Dublin is probably the only developed country with very very poor transport infra and it’s expensive and most of the areas you will find one bus in an hour.
@LeMerch
2 жыл бұрын
The new bus system is great. The lines now connect almost everywhere and they will become 24hrs. Also, they are now building the MetroNorth which is the first underground metro from south city to the airport and onto Swords.. I think eventually an underground will be built off this.
@simeranand
2 жыл бұрын
@@LeMerch they are not building it now as in now now. The work has not even started it. It was planned to be completed in 202x and now it is planned to be completed in 2035.
@pmberry
2 жыл бұрын
You've not been to Leeds then.
@mattpbent
2 жыл бұрын
chorus un per air ann =CIE
@seanbonella
2 жыл бұрын
Córas Iompair Éireann
@mattpbent
2 жыл бұрын
@@seanbonella I spelt it phonetically, he clearly can't pronounce irish
Пікірлер: 30