The video starts with IFS digging out the temp casings for one of the 4 in-water supports for the MLC300's "dance floor"/crane deck. We proofed the pilings with a diesel hammer before the tops of the pilings were cut off. Once the dance floor was complete, we could get the rebar shaft cage ready to fly. The MLC300 picked up the shaft cage horizontally and with help from our Grove crane on the tail line, shifted it vertical. The crane operator then had to reach across the river to lower the rebar cage into the shaft.
0:00 - Intro
0:14 - Case Digging
0:37 - Diesel Hammer Piling
1:14 - Crane Installing Steel Platform Beams
2:03 - Cranes Erecting Rebar Shaft Cage
2:15 - Transporting Shaft Cage
2:34 - Shaft Cage Over River
3:28 - Shaft Cage in Shaft
+++SUBSCRIBE+++
Follow Ceccanti at facebook.com/ceccantiinc
AND
Instagram @ceccanti_inc