The Green Line extension or GLX will add two branches to the northern end of the Green Line which currently has 4 branches on its southern end. The Union Square branch will only include 1 station, and the Medford Branch will add 5 stations to the system. The Union Square branch is planned to open in September 2021, and the Medford branch is scheduled to open in December 2021.
With the opening of the Green Line Extension the new service pattern will see E Branch trains running from Heath Street to Medford/Tufts. D Riverside trains will be extended along the short 1 station Union Square Branch. C Cleveland Circle trains currently terminate at North Station, but the line will be shortened to Government Center, with the opening of the GLX. Lastly, the B Boston College branch, which currently terminates at Park Street, will be extended and will also terminate at Government Center.
Thanks for watching, and be sure to subscribe for more updates!
Contact:
Email: thefourfoot8@gmail.com
Twitter: @TheFourFoot
Instagram: @TheFourFoot
Patreon: www.patreon.com/thefourfoot?f...
Timestamps:
0:00 Intro/Green Line Overview
3:38 Rolling Stock
4:41 Lechmere Viaduct
5:41 Lechmere Station
7:14 Flying Junction
8:38 Union Square Branch
9:48 Union Square Station
11:45 Medford Branch
12:50 East Somerville Station
15:23 Gilman Square Station
16:59 Magoun Square Station
18:31 Ball Square Station
20:42 Medford/Tufts Station
22:00 Outro
#Boston #MBTA #GLX #Construction
D Branch Video from Boston by Rails: • MBTA Greenline D branc...
D Branch Video from Boston by Rails: • The face of the Green ...
B Branch Video from Aijale Dyob: • MBTA Green Line B Bran...
E Branch Video from TomedysTrains: • MBTA Green Line Tram a...
High Iron Video of Mattapan High Speed Line: • 70 Year Old Streetcars...
Music used in the video: • 🎧 "Back to the Grid" /...
4,961
Негізгі бет MBTA GLX! May 2021 Green Line Extension Construction Update!
Пікірлер: 488