On this video, ME systems was prepared, DGs are connected to the main bus bar, some auxiliary machineries as applicable were checked for proper operation, tests on telegraph and steering gear was carried out. You can stop the mooring winches before the time ends, just make sure that the ship is already at sea. I hope this video will help as your reference. Thanks!
- 2 жыл бұрын
MEEC - PREPARATION OF MAIN ENGINE FOR DEPARTURE ON KONGSBERG SIMULATOR
- Рет қаралды 11,771
Пікірлер: 29