An overview of the Micro surfacing process in the province of New Brunswick by The Miller group under contract to The New Brunswick Department of transportation and Infrastructure.
Location: Rte#8, Fredericton, between Princess Margaret Bridge and Rte#10
Application: Two lifts, Scratch and Seal. The Minimum application rate of the 2 combined lifts is 14 Kg per square meter. 3.7 meters wide per lane.
Equipment
(3) Western Star trucks w/ Bergkamp M210 Mixers
(1) Etnyre, tack distributor
(1) Volvo, Model L70, 3 yd bucket
Produced by Lindsay Carr, DTI
www.gnb.ca/0113/
Thanks to: Industrial Cold Milling, The Miller group www.millergroup.ca/