How do you handle some futures that are not able to migrate from project online to project for the web , like forms .
@WellingtonePPM
7 ай бұрын
Aside from the current differences between the scheduling capability, we can extend PFTW with the Power Platform, so please take a look at the video that focuses on the Accelerator+ kzitem.info/news/bejne/2qBu2GigcKh2gpg
@harishpranavjagannath9599
Жыл бұрын
The MS project 365 was an excellent tutorial with step by step instructions. But it is not clear that sample project was “connected” to PowerBI. The PowerBI part begins with an already developed PowerBI report
@WellingtonePPM
Жыл бұрын
Thanks for commenting, due to webinar time constraints we jumped straight in to an existing report to demonstrate the 'final' product.
@Jay-iy3ng
Жыл бұрын
20 minutes and you didn't show how to connect microsoft project to power bi??
@WellingtonePPM
Жыл бұрын
Thanks for watching; that's not something we covered in this video but you can get instructions via the following link learn.microsoft.com/en-us/power-bi/connect-data/desktop-project-online-connect-to-data
@im_nomeis
2 жыл бұрын
Can we use offline Microsoft Project 2013?
@WellingtonePPM
Жыл бұрын
Hi, not with Power BI, you would have to reply on the in-built reports within Project Desktop.
Пікірлер: 9