Drilling 'Ambassador' Oilseed Rape using a Fendt 724 and Vaderstad Rapid 400s. The field in the video is called Right Nash and was drilled on the 10th September 2020. Although it was the final field to be drilled this is later than we would have liked and typically aim to finish oilseed rape drilling no later than the 6th September. The headlands of the surrounding fields were drilled later that day following the Sumo Trio.
A big thank you to Alex Lawson for the drone footage and for editing the footage (I can only take credit for the music chosen & putting the drill in the ground). Give him a follow on Instagram - alex_lawson17.
Thank you very much for watching!
JJ MacLeod
Негізгі бет Oilseed Rape Drilling 2020 | JJ MacLeod
Пікірлер: 12