The drill should have been "red tagged" out of order with the damaged grounding pin. And the 4 sq outlet box been de-energized tagged until it was properly repaired. Power ought to be shut off with replacement of a 3 phase breaker, and been "red tagged" when it tested defective.
@kawman55
3 жыл бұрын
Much was made of lack of PPE in last case presented. Fair enough. Electrician was troubleshooting so had to work live. PPE would be critical. So I’m surprised little was said about it in case 1. There were numerous errors in procedure as noted but, additionally, power SHOULD have been shut off to the panel for breaker replacement; live work was likely not justified. But, as live work WAS being done, electrician should have had full PPE including face shield, gloves and FR clothing. Probably would have saved his life. Also should have put cover back on panel before energizing. Sad.
@zpat007
9 ай бұрын
I bet these guys gave Meryl Streep acting lessons.
@helenkeller7783
3 жыл бұрын
Man, this is some porn level acting
@rubicsguy4747
Жыл бұрын
The only funny comment
@edwinothuke1487
3 ай бұрын
The electrical breaker was not properly handed over as per job procedures.
@daveyt4802
4 ай бұрын
First team didn't want to stay and finish the job. Why? To save OT pay? Could have just thrown away the defective CB.
@ILikeGuns1992
2 жыл бұрын
What exactly electrician in last example did wrong? I didn't even seen any actual electric use such gloves - always bare hands. Also how do you even imagine working while wearing these massive gloves?
@daveyt4802
4 ай бұрын
Cheap owners who don't train employees or give proper PPE. How old is this video anyway? 30 years?
Пікірлер: 10