Pile embedded length is very important into pile cap to resist the lateral load like earthquake and wind pressure for a building/structure. So, provide the Pile embedded length 3” to 4” into pile cap during building construction.
Contact for Building Design
Engr.Md.Mizanur Rahman
Structural Design Engineer(Building)
B.Sc in Civil (RUET), M.Sc in Structure(MIST, BUP)
MIEB, RAJUK Enlisted with Top Category.
House#30, Achieve A R Tower (1st Floor, East Side), Mollapara Road,Taltola, Agargaon, Dhaka.
Mob: 01671-185197 (WhatsApp Only)
#EmbeddedLength
#PileCap
#CivilEngineerMizan
#Pile
#PileCapCasting
#BuildingConstruction
Your Questions 👇
civil engineering
গ্রেড বিম বাধার নিয়ম
building design
civil engineer
ছাদের রড ফেলার নিয়ম
Pile Cap
Pile
Pile tips
pile foundation
Pile embedded length
What is embedded length into pile cap
why embedded length so important for pile Cap
pile cap casting,check the pile cap
pile cap before casting
pile head breaking,pile cap casting in bangla
rod binding of pile cap
pile cap casting on site
how to cast pile cap
pile cap design,situ pile
rod binding
civil engineering
গ্রেড বিম বাধার নিয়ম
building design
civil engineer
Негізгі бет পাইল ক্যাপে পাইল এমবেডেড লেঙ্থ কি?।Pile Embedded Length in Pile Cap। Importance of Embedded Length।
Пікірлер: 40