Type of Formwork Minimum Period
Before Striking Formwork
Soffit formwork to slabs 3 days
(Props to be refixed
immediately after removal
of formwork)
Props to slabs:
1) Spanning up to 4.5 m 7 days
2) Spanning over 4.5 m 14 days
Soffit formwork to Beams: 7days
(Props to be refixed
immediately after removal
of formwork)
Props to Beams:
1) Spanning up to 6 m 14 days
2) Spanning over 6 m 21 days