Behind the scenes planning the conjunction of Making Tracks “The Big Challenge”.
While Making Tracks 3 is installed at Chester Cathedral, the team discuss and assemble parts of the previous two layouts to test fit and blend the scenery.
This will be a 150 foot (50 meter) long layout that comprises the three layouts into a super layout.
Just some if the issues we need to solve include:
• Coupler reliability.
• How do you control a train that is so far away you can’t see it?
• How do we manage the scenic sections so there are always trains visible on track?
• How do we connect and test our control system and ensure its fit for purpose?
• Derailment planning.
• Staffing levels.
• How this differs from the Cathedral Exhibition.
Making Tracks 1, 2 & 3 use MegaPoints Controllers exclusively for their control systems. Making Tracks 3 uses MegaPoints Controllers System2.