It has been refreshing for us to keep watching your videos on KZitem for the past few weeks.We all kindly request you to keep making and posting such piping related videos and at least you should post more than one video per day.
@faizalrmajeed1029
Жыл бұрын
very useful....i was doubtful with back seat testing....now its clear
@aghilmoghbeli7626
2 жыл бұрын
Thank you Sir for new and very nice videos I am very happy with this videos, please prepare a video about valve trimes and trim materials. Best regards
@rajeshmavia5424
Жыл бұрын
Nailed it sir. But for seat test test and backseat test you have written 1.5times instead of 1.2. very happy to post videos often.my humble you to Keep on continuing
@sen-ow7ub
2 жыл бұрын
I humbly request you to keep posting more piping related videos. Thanks
@vtbhanukiran1231
Жыл бұрын
Thank you for the video. Beautiful one. For backseat test of gate or globe valve, the valve should have a back seat bush and the valve should be in fully open condition. With spindle chamfered portion mating with back seat bush in fully open condition.
@vigneshwaran36
8 ай бұрын
Awesome explain about the pressure testing for GV. thanks you so much
@AHMEDALI-rq7jg
7 ай бұрын
Thanks
@sen-ow7ub
Жыл бұрын
We are learnt well about the valve testing , like body testing, pressure testing or seat leakage test. And backseat test exclusive for gate valve and globe valve. Thanks lot sir. Please make more videos.
@duraiac4427
Жыл бұрын
Good explanations & easy to understand pratically.
@randomvideosindia8694
Жыл бұрын
Sir your this video helped me a lot to understand
@p.gunasekaran8081
Жыл бұрын
Wonderful explanation...!!
@avijitshyam
Жыл бұрын
Brilliant explanation.
@sen-ow7ub
2 жыл бұрын
The amazing explanation i have never seen such kind of explanation before. Awesome thanks, sir. Please could you explain some of the valves identify Field Valve Test .These valves should be tested on site also as per Aramco STD. may be the reason for double checking, there is the possibility of valves may be slightly damaged during the transportation or any other reason. Do you have any idea or experience about such kind of critical valve should be tested in site. Even if already done all the tests in Shop. Please explain verbally. Thanks, sir may be below the valve please explain this under site test TSO control valves, crude recycle PV, min flow recycle valves, suction KODs LCV, hot oil ring spill back CV), MOVs that are used for equipment or train/system isolation they must be tested. Testing shall include at least the DBB and not only single valve. please dedicated post on this topic. thanks
@suryanathyadav8830
Жыл бұрын
Good description
@surabhithpk656
Жыл бұрын
Useful
@manojalvandar9810
Жыл бұрын
How clamping pressure of a valve is determined from shell test pressure ?
@mukundmistry1661
Жыл бұрын
Dear sir, kindly please share that chart testing which is you highlighted 🙏🙏
@saquibkhan1230
4 ай бұрын
What is control valve Seat leakage Calculation Formula.
@penugondasuryakumar8632
Жыл бұрын
Thank you sir
@sen-ow7ub
Жыл бұрын
After purchasing the valves from the vendor and keeping them in warehouse for six months, we are not able to install them at the site due delay of activities , in this situation if more than 6 months, the valve whether need to test again before installing to site.
@thecros1076
Жыл бұрын
Can piston lift check valve be used in Cryogenic flow ?