Welcome to Barnabas Junction.
In this 1st part I explain how the control panel was constructed, show how the (On - Off - On) momentary switches are fitted into the control panel and show how they are then wired up.
N.B. This setup is my way on how to simply operate insulfrog points.
I wish to extend my many thanks to Jamie at Pennyhill Junction (bit.ly/2k7o2ep) for the help with the superb control panel track plan and also Garry at Cheekytek (bit.ly/2BCU76k) for the excellent technical advice with the wiring of the switches and point motors.
Look out for Part 2 coming soon, showing point motor installation, wiring them up and then connecting to the control panel for operation.
I hope you enjoy watching.
Please Like, Share, Comment & Subscribe.