This house had a good slab, but it was getting water in under the house. We raised the slab 2" to get the grade above the dirt line.
- Күн бұрын
Pouring a 2 inch overlay on existing slab
- Рет қаралды 182
This house had a good slab, but it was getting water in under the house. We raised the slab 2" to get the grade above the dirt line.
Пікірлер